Case Study # 1:
Philippine Steel Tower Fabrication Plant with its Diesel-fired open-top Galvanizing Kettle (1.5M depth x 1M width x 7M length - with a maintaining temperature of about 400 degree Centigrade) uses up about 15,000 liters of Diesel monthly operating 24x7 weekly. The Plant is located about 10 kms away from Landfills; about 5 kms away from Livestock Farms and from 2 Feedmills; about 100 meters from an Industrial Sawmill. Given the location & the land area of the Plantsite, we do not find advisable the use of Sun & Wind. Instead, we plan to convert from the present use of "dirty" Diesel to our envisioned "renewable" Alternative Energy Mix (AEM) of probably BioMass(Sawdust & other Biodegrable Waste) + BioGas(Methane). Is it cheap to clean (if necessary) Methane Gas drawn from Landfills &/or Livestock Farms? Is it cheap to compress and to store Methane Gas in a Tanker Truck - if technically feasible? Is it cheap to convert "raw" Sawdust into a BioMass with a higher BTU - if technically feasible? Is our envisoned AEM technically probable and economically viable? Could Heat Recovery System be adapted to a Hot-Dip Open-Bath Cooking Kettle?
Case Study # 2:
A rural-based Industrial Plant (using up 1 million liters of Bunker and 36 thousand liters of Diesel a month located along the Pacific coastline with lots of Sun, Wind, Wave and with a By-product Waste of "Spent Earth" with about 20% Oil content) is seriously considering the swift from Fossil fuel to BioMass Farm Waste - i.e. Rice Hull, Coconut Husk w/ Shell, etc. Further to an Offer-to-Convert from a Filipino Specialist Company of BioMass-fired Boilers, this prospect Client is eagerly inclined to take advantage of cutting its Fuel Cost estimated to go down to 1/30th vs it's present Delivered Cost of Fossil Fuel. We contend however that (given the Plantsite's location) 100% free clean energy from our envisioned Alternative Energy Mix (AEM: 33% Sun + 33% Wind + 33% Wave + 1 % Spent Earth) might be the "ideal" solution towards a Cost Cutting & Clean Environment. Is our proposed AEM Technically feasible and Economically viable? Are technologies presently available to enable the Power Plant Conversion operational within 6 months from approval of our AEM Proposal?
__________________
Mortal LIFE is all about Time Management in the Service-of-Others for the greater glory of God here on Earth.
|